01
Two rolling controls
The August 31 progression report assigns rarer-roll odds to Ore Luck and additional rolling positions to Rolling Pedestals.
02
Read the state before buying
| What is waiting? | Next action | When to hold the purchase |
|---|---|---|
| An owned ore beside open, empty mining space | Place it in that space and let the drone work. | Do this before paying for another floor. |
| Output ready for collection or a crate already carried | Collect it and complete the sale. | More production does not finish this pending pickup or sale. |
| All usable compartments occupied; another ore ready | Price an accessible compartment, or the next floor plus a compartment. | Do not spend the entire budget on floor access if its compartment remains unaffordable. |
| The occupied compartment is still working | Compare one production change with the timed procedure. | Do not change several factors before checking the result. |
03
Make one affordable change
Write down the next action’s displayed cash cost and a reserve for the purchases needed to keep your chosen loop running. If the cost exceeds cash minus that reserve, finish another sale or choose the free action above. Keep Robux outside this cash comparison.
After a purchase, return to the same state check. If crates now arrive before you collect them, address collection; if empty space remains, put it to work. This is a conditional spending routine, not a tested universal order or a promise that each level pays back.